Unknown height. Generic low-rise drawing: this building's height is not measured yet.
MISSION·condoData refreshed 2026-11-14
330 26 AV SW
- Built 1977The year the City record gives for the building's construction. Where the City has no year, the page says Unknown rather than guessing. Methodology.
- 140 unitsHow many residential units the City record lists for this address. A resident correction replaces the City figure when a verified representative confirms a different count. Methodology.
- Construction unknownThe likely construction type, estimated from the storey count and the year built under the Alberta Building Code rules in the methodology. A moderator-confirmed value replaces the estimate. Methodology.
- 0 short-term rental licencesThe number of active short-term rental licences the City has issued at this address. An address with no licence cannot lawfully offer short-term rentals. Methodology.
140 unitsHow confident the site is in the unit count: a resident correction, a National Address Register estimate, a plain City roll count, or unknown. The label travels with the number everywhere it appears. Methodology.
- unit count source: city_assessment
- unit count: 140
The storey count is an estimate from the building's LiDAR height divided by 3.1 m per storey, so a short or tall floor plan can shift it by one. It is labelled "estimated" wherever it appears. Methodology.
The construction class is estimated from the storey count and year built under Alberta Building Code rules, not published by the City. A moderator-confirmed value replaces the estimate. Methodology.
- year built: 1977
- class: unknown
1. Assessed valueThe value the City places on each property each roll year, used to set property taxes. For a condo building the page shows the median of its unit roll values; for a rental building, the total. Methodology.
Source: assessment_current. Last refreshed: 2026-11-14. Method
Source: assessment_history. Last refreshed: 2026-11-14. Method
Median unit value rose 34% from 2023 to 2025 ($445 000 to $597 500), after falling 26% from its 2025 peak. MISSION condos rose 31%; Calgary condos rose 51%.The change in the building's median unit assessed value over the last two roll years, with the community and city changes for comparison. It is arithmetic on City assessment records, not a prediction. Methodology.
- value now: 597500
- value 2y: 445000
- value peak: 597500
- peak year: 2025
- community change 2y: 30.75
- city change 2y: 51.35135135135135
- year: 2025
- community: MISSION
At $597 500, this building's median unit sits higher the MISSION condo median ($261 500) and higher the Calgary median ($308 000).Where the building's median unit value sits against its community median and the Calgary median. "Near" means within 5 percent. Methodology.
- value now: 597500
- community median: 261500
- city median: 308000
- community: MISSION
- 2025: $597,500 median unit assessed value
- 2024: $487,250 median unit assessed value
- 2023: $445,000 median unit assessed value
- 2022: $420,500 median unit assessed value
- 2021: $415,000 median unit assessed value
- 2020: $432,500 median unit assessed value
- 2019: $451,250 median unit assessed value
- 2018: $454,500 median unit assessed value
- 2017: $455,000 median unit assessed value
- 2016: $445,250 median unit assessed value
- 2015: $437,750 median unit assessed value
- 2014: $368,750 median unit assessed value
- 2013: $378,000 median unit assessed value
- 2012: $357,500 median unit assessed value
- 2011: $345,500 median unit assessed value
- 2010: $355,500 median unit assessed value
- 2009: $465,000 median unit assessed value
- 2008: $501,750 median unit assessed value
- 2007: $389,500 median unit assessed value
- 2006: $266,500 median unit assessed value
- 2005: $235,500 median unit assessed value
2. PermitsCity records of approved construction and trade work at this address: building, development, plumbing and gas permits. A permit's status tells you whether work was approved, finished, allowed to lapse or is still being reviewed. Methodology.
Source: permits. Last refreshed: 2026-11-14. Method
Source: development_permits. Last refreshed: 2026-11-14. Method
Source: plumbing_permits. Last refreshed: 2026-11-14. Method
Source: gas_permits. Last refreshed: 2026-11-14. Method
- 1Open
- 16Completed
- 1Expired or cancelled
1 permit open: BP2026-13919. Last completed: building permit BP2026-17805 (2 Oct 2026), described as "interior alteration".The count of open permits and the most recently completed permit at this address. Open means the City issued the permit and the work is not reported finished. Methodology.
- open permits: [{"permit_type":"building","permit_number":"BP2026-13919","issued_date":"2026-08-20","description":"Exterior Maintenance - Roxboro House Calgary"}]
- latest completed: {"permit_type":"building","permit_number":"BP2026-17805","issued_date":"2026-10-02","description":"interior alteration"}
0 permits predate this building (built 1977) and belong to the site.Permits issued before the building's construction year describe work on the site under a previous building. They belong to the address, not to the current building. Methodology.
- year built: 1977
- permits before build: 0
2026
2026-10-02: building permit BP2026-17805, Apartment, Improvement, described as "interior alteration", estimated cost $12 000Completed
2026-08-20: building permit BP2026-13919, Apartment, Improvement, described as "Exterior Maintenance - Roxboro House Calgary", estimated cost $197 988Open
2025
2025-07-16: building permit BP2025-05301, Apartment, Improvement, described as "Roxboro Canopy - Exterior alterations", estimated cost $208 000, contractor PERSIMMON CONTRACTINGCompleted
2025-04-29: development permit DP2025-02517, Change of Use - With Change to Site Plan, described as "CHANGES TO SITE PLAN: DWELLING UNITS (REFURBISH BUILDING FACADE & LANDSCAPE)"Completed
2023
2023-12-22: building permit BP2021-10292, Apartment, Improvement, described as "Repair of cinderblock wall due to vehicle impact.", estimated cost $21 467Completed
2022
2022-08-21: building permit BP2022-11829, Apartment, Improvement, described as "Roxboro House - IGU Replacement", estimated cost $504 500Completed
2021
2021-09-29: building permit BP2021-15737, Apartment, Improvement, described as "Roxboro House - IGU Replacement", estimated cost $516 958.15Completed
2020
2020-12-08: building permit BP2020-17920, Single Family, Improvement, described as "Improvements"Expired or cancelled
2020-02-11: building permit BP2020-01393, Industrial, Unspecified, described as "Roxboro - Fire Alarm Upgrade", estimated cost $2 800, contractor 4-SITE ELECTRICCompleted
2020-01-08: building permit BP2019-16655, Apartment, Improvement, described as "Interior alterations.", estimated cost $97 475Completed
2017
2017-06-27: building permit BP2017-07339, Industrial, Improvement, described as "Roxboro House Condominium 2017 Parkade Upper Ramp Maintenance", estimated cost $126 060, contractor BURTON GENERAL CONTRACTINGCompleted
2016
2016-08-18: building permit BP2016-07862, Apartment, Improvement, described as "Roof repairs at Roxboro House", estimated cost $900 000Completed
2014
2014-10-09: building permit BP2014-14197, Apartment, Improvement, estimated cost $165 000, contractor NCI CONSTRUCTIONCompleted
2013
2013-10-23: building permit BP2013-14988, Apartment, Improvement, estimated cost $58 975Completed
2013-09-01: building permit BP2013-12244, Apartment, Improvement, described as "alarm upgrade", estimated cost $7 500Completed
2011
2011-10-13: building permit BP2011-11597, Apartment, Improvement, described as "Code upgrade. Barrier Free upgrade. Fire Alarm and Security Upgrade", estimated cost $120 000Completed
2003
2003-06-27: building permit BP2003-06129, Apartment, Improvement, described as "Repairs (waterproofing) to roof & interior of parkade", estimated cost $210 000Completed
1995
1995-07-27: development permit DP1995-3016, described as "CONVERTED JOB - EXTERIOR RENOVATIONS TO EXISTING ENTRY CANOPY & NEW DRIVEWAY ENTRANCE FEATURES"Completed
3. Assessment appealsA property owner can appeal the City's assessment of their property to an independent review board. These are the recorded outcomes for this building, with the City's spelling of the outcome normalized. Methodology.
Source: appeals. Last refreshed: 2026-11-14. Method
- 2025: No Change
- 2016: No Change
- 2015: No Change
3 appeals in 15 years (3 No Change); the median Calgary condo building has 0.How many assessment appeals this building has had in 15 years, against the median for Calgary buildings of the same type. An appeal is not evidence the assessment was wrong; most are resolved without changing it. Methodology.
- appeals 15y: 3
- city median appeals 15y: 0
- appeals outcomes: [{"outcome":"No Change","count":3}]
- building type: condo
4. Community context: MISSIONThese figures describe the whole community, not this building. They come from City records aggregated by community boundary. Methodology.
About the community, not this building
Source: community_stats_1. Last refreshed: 2026-11-14. Method
Source: community_stats_2. Last refreshed: 2026-11-14. Method
MISSION logged 1 709 service requests in the last 12 months: 379.4 per 1,000 residents and 49.1 per 100 dwellings, higher than 63% of Calgary communities per 1,000 residents.The community's City service requests over the last 12 months, normalized per 1,000 residents and per 100 dwellings so communities of different sizes can be compared. The percentile says where the community sits among Calgary communities with at least 1,000 residents. Methodology.
- total 12m: 1709
- population: 4505
- dwellings: 3479
- percentile per 1000: 63
- percentile per 100dw: 9
- community: MISSION
The most common requests were Roads (19%), Corporate (19%) and Bylaw (15%).The three largest categories of the community's service requests, by share of the 12-month total. Categories are the City's own service names, grouped by their prefix. Methodology.
- top categories: [{"category":"Roads","share":19},{"category":"Corporate","share":19},{"category":"Bylaw","share":15},{"category":"Parks","share":13},{"category":"Assessment","share":7},{"category":"Waste and Recycling Services","share":7},{"category":"Fire","share":7},{"category":"Water Services","share":4}]
Requests rose 11% compared with the previous 12 months.Whether the community's service requests rose or fell compared with the previous 12 months. Two years of history, not a long-run trend. Methodology.
- requests 12m: 1709
- requests prior 12m: 1537
Why a raw per-resident rate can mislead here. Downtown communities carry city-wide services, and very small communities have too few residents for a reliable rate. Methodology.
- sector: CENTRE
- population: 4505
Social disorder reports: Not available for this community; see methodology.
5. ResidentsComments from residents who have lived at or visited this building, published under the site's moderation rules. A comment is one resident's experience, not a verified fact about the building. Methodology.
No resident comments on record for this building.
6. About this dataEvery dataset this page draws from, with its City dataset id and the date the pipeline last refreshed it. The methodology page explains what each source covers and what it cannot tell you. Methodology.
- Source: appeals. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: assessment_current. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: assessment_history. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: community_profiles. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: community_stats_1. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: community_stats_2. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: development_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: estimates. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: gas_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: osm_names. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: plumbing_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: price_series. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: short_term_rentals. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Methodology