HardshellBuildings

Unknown height. Generic low-rise drawing: this building's height is not measured yet.

DOWNTOWN WEST END·condoData refreshed 2026-11-14

Tarjan Place (estimated name)

1111 6 AV SW, Calgary

  • Built 2005The year the City record gives for the building's construction. Where the City has no year, the page says Unknown rather than guessing. Methodology.
  • 287 unitsHow many residential units the City record lists for this address. A resident correction replaces the City figure when a verified representative confirms a different count. Methodology.
  • Construction unknownThe likely construction type, estimated from the storey count and the year built under the Alberta Building Code rules in the methodology. A moderator-confirmed value replaces the estimate. Methodology.
  • 0 short-term rental licencesThe number of active short-term rental licences the City has issued at this address. An address with no licence cannot lawfully offer short-term rentals. Methodology.

287 unitsHow confident the site is in the unit count: a resident correction, a National Address Register estimate, a plain City roll count, or unknown. The label travels with the number everywhere it appears. Methodology.

  • unit count source: city_assessment
  • unit count: 287

The storey count is an estimate from the building's LiDAR height divided by 3.1 m per storey, so a short or tall floor plan can shift it by one. It is labelled "estimated" wherever it appears. Methodology.

    The construction class is estimated from the storey count and year built under Alberta Building Code rules, not published by the City. A moderator-confirmed value replaces the estimate. Methodology.

    • year built: 2005
    • class: unknown

    1. Assessed valueThe value the City places on each property each roll year, used to set property taxes. For a condo building the page shows the median of its unit roll values; for a rental building, the total. Methodology.

    Source: assessment_current. Last refreshed: 2026-11-14. Method

    Source: assessment_history. Last refreshed: 2026-11-14. Method

    0234k469k159,000245,500303,000272,500219,000229,000237,000249,000249,000269,000273,000257,500246,000230,500216,500202,500188,500192,500215,000255,00020052025

    Median unit value rose 32% from 2023 to 2025 ($192 500 to $255 000), after falling 36% from its 2008 peak. DOWNTOWN WEST END condos rose 19%; Calgary condos rose 51%.The change in the building's median unit assessed value over the last two roll years, with the community and city changes for comparison. It is arithmetic on City assessment records, not a prediction. Methodology.

    • value now: 255000
    • value 2y: 192500
    • value peak: 303000
    • peak year: 2008
    • community change 2y: 18.91233766233766
    • city change 2y: 51.35135135135135
    • year: 2025
    • community: DOWNTOWN WEST END

    At $255 000, this building's median unit sits lower the DOWNTOWN WEST END condo median ($366 500) and lower the Calgary median ($308 000).Where the building's median unit value sits against its community median and the Calgary median. "Near" means within 5 percent. Methodology.

    • value now: 255000
    • community median: 366250
    • city median: 308000
    • community: DOWNTOWN WEST END
    • 2025: $255,000 median unit assessed value
    • 2024: $215,000 median unit assessed value
    • 2023: $192,500 median unit assessed value
    • 2022: $188,500 median unit assessed value
    • 2021: $202,500 median unit assessed value
    • 2020: $216,500 median unit assessed value
    • 2019: $230,500 median unit assessed value
    • 2018: $246,000 median unit assessed value
    • 2017: $257,500 median unit assessed value
    • 2016: $273,000 median unit assessed value
    • 2015: $269,000 median unit assessed value
    • 2014: $249,000 median unit assessed value
    • 2013: $249,000 median unit assessed value
    • 2012: $237,000 median unit assessed value
    • 2011: $229,000 median unit assessed value
    • 2010: $219,000 median unit assessed value
    • 2009: $272,500 median unit assessed value
    • 2008: $303,000 median unit assessed value
    • 2007: $245,500 median unit assessed value
    • 2006: $159,000 median unit assessed value

    2. PermitsCity records of approved construction and trade work at this address: building, development, plumbing and gas permits. A permit's status tells you whether work was approved, finished, allowed to lapse or is still being reviewed. Methodology.

    Source: permits. Last refreshed: 2026-11-14. Method

    Source: development_permits. Last refreshed: 2026-11-14. Method

    Source: plumbing_permits. Last refreshed: 2026-11-14. Method

    Source: gas_permits. Last refreshed: 2026-11-14. Method

    • 1Open
    • 5Completed
    • 9Expired or cancelled
    DecJanAprJulOctJanAprJulOct

    1 permit open: BP2023-13943. Last completed: building permit BP2019-09167 (16 Jul 2019), described as "Fire Alarm Upgrade - Group C - Tarjan Place".The count of open permits and the most recently completed permit at this address. Open means the City issued the permit and the work is not reported finished. Methodology.

    • open permits: [{"permit_type":"building","permit_number":"BP2023-13943","issued_date":"2024-02-16","description":"Tarjan Point Fire Alarm Repairs"}]
    • latest completed: {"permit_type":"building","permit_number":"BP2019-09167","issued_date":"2019-07-16","description":"Fire Alarm Upgrade - Group C - Tarjan Place"}

    12 permits predate this building (built 2005) and belong to the site.Permits issued before the building's construction year describe work on the site under a previous building. They belong to the address, not to the current building. Methodology.

    • year built: 2005
    • permits before build: 12
    • 2024

      2024-02-16: building permit BP2023-13943, Apartment, Unspecified, described as "Tarjan Point Fire Alarm Repairs", estimated cost $69 000Open

    • 2019

      2019-07-16: building permit BP2019-09167, Apartment, Unspecified, described as "Fire Alarm Upgrade - Group C - Tarjan Place", estimated cost $2 000Completed

    • 2005

      2005-12-05: development permit DP2005-3962, Change of Use - Discretionary Use or Relaxations Required, described as "CHANGE OF USE - GROCERY STORE AND SIGNAGE"Completed

    • 2003

      2003-12-08: building permit BP2002-16984, Apartment, New, described as "New Apartment Building with Commercial", estimated cost $18 478 500, contractor POINTE OF VIEW CONDOMINIUMS (TARJAN POINTE) INC..Completed

    • 2002

      2002-06-06: development permit DP2002-1689, described as "287 UNIT APARTMENT BUILDING & COMMERCIAL DEVELOPMENT"Completed

      2002-02-15: development permit DP2002-0425, described as ": SIGN"Expired or cancelled

      2002-01-21: development permit DP2002-0160, described as ": SIGN"Expired or cancelled

    • 1999

      1999-04-21: development permit DP1999-1225, described as "CONVERTED JOB - TEMPORARY PARKING AREA (RENEWAL OF DP# 19940982) FOR 5 YEARS"Expired or cancelled

      1999-03-08: development permit DP1999-0683, described as "CONVERTED JOB - TEMPORARY SALES TRAILER (2 YRS)"Expired or cancelled

    • 1996

      1996-12-02: development permit DP1996-3328, described as "CONVERTED JOB - THIRD PARTY ADVERTISING SIGN - TEMPORARY FOR FIVE YEARS (RENEWAL OF DP91/1418)"Expired or cancelled

      1996-10-25: development permit DP1996-2976, described as "CONVERTED JOB - THIRD PARTY ADVERTISING SIGN (TEMP FOR 5 YRS)(RENEWAL OF DP91/2430)"Expired or cancelled

    • 1994

      1994-03-25: development permit DP1994-0982, described as "CONVERTED JOB - SURFACE PARKING LOT & RELATED SIGNAGE (5 YEARS)"Expired or cancelled

    • 1991

      1991-09-30: development permit DP1991-2430, described as "CONVERTED JOB - THIRD PARTY ADVERTISING SIGN - FREESTANDING SIGN (RENEWAL OF DP86/1247)(5 YEARS)"Expired or cancelled

      1991-06-14: development permit DP1991-1418, described as "CONVERTED JOB - THIRD PARTY ADVERTISING SIGN (5 YEARS) (RENEWAL OF DP85/1417)"Expired or cancelled

    • 1986

      1986-08-12: development permit DP1986-1247, described as "CONVERTED JOB - FREESTANDING (TEMPORARY FOR 5 YEARS)"Completed

    3. Assessment appealsA property owner can appeal the City's assessment of their property to an independent review board. These are the recorded outcomes for this building, with the City's spelling of the outcome normalized. Methodology.

    Source: appeals. Last refreshed: 2026-11-14. Method

      How many assessment appeals this building has had in 15 years, against the median for Calgary buildings of the same type. An appeal is not evidence the assessment was wrong; most are resolved without changing it. Methodology.

        No assessment appeals on record for this building.

        4. Community context: DOWNTOWN WEST ENDThese figures describe the whole community, not this building. They come from City records aggregated by community boundary. Methodology.

        About the community, not this building

        Source: community_stats_1. Last refreshed: 2026-11-14. Method

        Source: community_stats_2. Last refreshed: 2026-11-14. Method

        Service requests, last 12 monthsThe community's City service requests over the last 12 months, normalized per 1,000 residents and per 100 dwellings so communities of different sizes can be compared. The percentile says where the community sits among Calgary communities with at least 1,000 residents. Methodology.1 377 (487.43 per 1,000 residents; 66.81 per 100 dwellings)
        Corporate299Bylaw289Roads229Parks99Fire77Assessment76Transit65CT AC36015330663727279838511512214210410010274917510511410511525097179116877462758911514012930612612110436Dec 2023Nov 2026

        DOWNTOWN WEST END logged 1 377 service requests in the last 12 months: 487.4 per 1,000 residents and 66.8 per 100 dwellings, higher than 76% of Calgary communities per 1,000 residents.The community's City service requests over the last 12 months, normalized per 1,000 residents and per 100 dwellings so communities of different sizes can be compared. The percentile says where the community sits among Calgary communities with at least 1,000 residents. Methodology.

        • total 12m: 1377
        • population: 2825
        • dwellings: 2061
        • percentile per 1000: 76
        • percentile per 100dw: 42
        • community: DOWNTOWN WEST END

        The most common requests were Corporate (22%), Bylaw (21%) and Roads (17%).The three largest categories of the community's service requests, by share of the 12-month total. Categories are the City's own service names, grouped by their prefix. Methodology.

        • top categories: [{"category":"Corporate","share":22},{"category":"Bylaw","share":21},{"category":"Roads","share":17},{"category":"Parks","share":7},{"category":"Fire","share":6},{"category":"Assessment","share":6},{"category":"Transit","share":5},{"category":"CT AC","share":3}]

        Requests fell 2% compared with the previous 12 months.Whether the community's service requests rose or fell compared with the previous 12 months. Two years of history, not a long-run trend. Methodology.

        • requests 12m: 1377
        • requests prior 12m: 1408

        Why a raw per-resident rate can mislead here. Downtown communities carry city-wide services, and very small communities have too few residents for a reliable rate. Methodology.

        • sector: CENTRE
        • population: 2825
        Population 2021The community's population from the 2021 federal census. The year is shown with the figure because it moves only every census. Methodology.2 825
        Dwellings 2019The community's dwelling count from the 2019 civic census, with the share that are apartments. Used to normalize service requests per 100 dwellings. Methodology.2 061 (100% apartments)

        Social disorder reports: Not available for this community; see methodology.

        5. ResidentsComments from residents who have lived at or visited this building, published under the site's moderation rules. A comment is one resident's experience, not a verified fact about the building. Methodology.

        No resident comments on record for this building.

        6. About this dataEvery dataset this page draws from, with its City dataset id and the date the pipeline last refreshed it. The methodology page explains what each source covers and what it cannot tell you. Methodology.

        • Source: appeals. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: assessment_current. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: assessment_history. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: community_profiles. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: community_stats_1. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: community_stats_2. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: development_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: estimates. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: gas_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: osm_names. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: plumbing_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: price_series. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Source: short_term_rentals. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
        • Methodology